Contact the team
ENERGY INTELLIGENCE FOR SINGAPORE DATA CENTRE OPERATORS

Plan for power
in Singapore with clarity.

Thrumwatt brings recorded meter use, a rolling average-demand projection and configured facility capacity into view for Singapore data centre teams reviewing energy costs.

Review meter history, average demand and configured capacity
THRUMWATT / ENERGY INTELLIGENCE
Illustrative view

CAMPUS OVERVIEW

North campus · All facilities

Latest average demand42.8 MW 2.4% Illustrative comparison
Average headroom8.4 MW Illustrative comparison
24-hour average projection43.6 MW Illustrative view
Average power demandObserved average and projection
60 MW40 MW20 MW0 MWLatest valid average24-hour average projectionConfigured limit
Illustrative projection from meter history
Illustrative product view
Average headroomCompared with configured site limits
METER HISTORY. AVERAGE DEMAND. CONFIGURED CAPACITY.01 / 03
A clearer view of
Demand+Capacity+Cost+Flexibility
THE PLATFORM

Energy decisions start with
understanding.

For data centre teams in Singapore, Thrumwatt connects recorded meter use, average-demand projections and configured facility capacity for operator review.

01

Review recorded use

Review dated meter history and valid average-demand intervals for a clearer view of recorded energy use.

Power-use visibility
02

Compare averages with configured capacity

Compare the latest valid or projected average demand with the facility power limit your team configured.

Average-demand context
03

Review tariff-aware estimates

When required saved inputs align, review an input-based estimate for a permitted load-shift scenario.

Conditional estimate
HOW IT WORKS

A clear sequence for
operator decisions.

Bring meter history, configured settings and supported comparisons into view before deciding what to review next.

01

STEP

Review the meter history

Where recent valid readings are available, compare the latest average demand and rolling 24-hour average-demand projection with the configured facility limit.

Dated readings + averages
02

STEP

Save the operating inputs

Configure the facility power limit, tariff details, and any registered load's permitted operating window your team wants to evaluate.

Capacity + rates + load window
03

STEP

Review conditional estimates

Use tariff-aware estimates only when recent meter history and the required saved facility, load-window, rate, currency and demand-charge inputs support a calculation.

Input-based estimates
FACILITY AVERAGE DEMANDROLLING 24-HOUR VIEW
Average demand, in context. Rolling projection
01Latest valid average
02Projected average demand
03Capacity
A CLEARER WAY TO PLAN

Make the inputs visible.
Review what they support.

Thrumwatt brings recorded meter use, projected average demand and configured facility capacity together. Tariff-aware estimates are available only when their saved inputs support a calculation.

  • Review dated meter history
  • Compare valid averages with the configured facility limit
  • Review conditional, input-based tariff estimates
Contact the team
SINGAPORE OPERATOR PLANNING

Work from the inputs Thrumwatt supports.

Review recorded meter use, average demand against configured capacity, and tariff-aware estimates when saved inputs support them.

METER HISTORY01

Understand recorded use

Review dated cumulative meter readings and the average demand derived from valid intervals.

CONFIGURED CAPACITY02

Compare averages with the saved limit

Compare the latest valid average-demand interval or rolling 24-hour average-demand projection with the facility power limit your team configured. This is average context, not instantaneous spare capacity, a peak-demand forecast, or approval for additional load.

TARIFF ESTIMATES03

Review conditional tariff estimates

When a recent projection and the required saved inputs—a registered load and permitted window, time-of-use rates, currency, demand-charge value, and facility limit—are available, review an input-based estimate. It is not a guaranteed outcome; Thrumwatt does not schedule or dispatch equipment.

WHY THRUMWATT

Power is a strategic resource.
Treat it like one.

Thrumwatt brings meter history, average-demand comparisons with a configured facility limit, and conditional tariff-aware estimates from saved inputs into view for operator review.

01 / COST

Understand the cost picture

Review recorded use and input-based tariff estimates when saved assumptions support a comparison.

02 / CAPACITY

Plan around constraints

Compare latest or projected average demand with the configured facility limit; this is not instantaneous spare capacity, a peak-demand forecast, or additional-load approval.

03 / FLEXIBILITY

Review permitted load inputs

Estimate a possible shift when a registered load's saved operating window and required tariff inputs support it; Thrumwatt does not schedule or dispatch equipment.

APPROVED PUBLIC PRICING

Clear pricing for
clearer decisions.

FREE 7-DAY TRIAL

A free 7-day trial is available.

THRUMWATT / MONITOR

Monitor

$499/month

No owner-approved description is published for this tier.

Included features

No owner-approved inclusions are published.

THRUMWATT / ENTERPRISE

Enterprise

Custompricing

No owner-approved description is published for this tier.

Included features

No owner-approved inclusions are published.

START A CONVERSATION

Plan your next
energy decision.

Share the energy or capacity question you’re working through at a Singapore site. The DCNrgIQ team will review the details you provide.

Contact the team